Johannesburg Water would like to inform all receiving their water supply from Honeydew reservoir and that our teams will be cleaning the Honeydew Reservoir from 01 to 03 December 2020.

Customers are advised that this is a routine maintenance exercise that is done with the sole aim of improving hygiene and ensure the quality of water provide continues to comply with the South African National Standards 241 (SANS241).

During the maintenance period, we don’t expect residents of the below areas to be impacted,  Bellairspark,  Boskruin, Boundary Park, Bromhof, Bushill Estate, Cosmo City, Honey Park, Honeydew Manor, Hoogland, Huntershill, Kevin Ridge, Kya Sands, Laser Park, Noordhang, Northriding, Northgate, Northwold, Olivedale, Randparkrif , Sharonlea, Radiokop, Sonnedal, Honeydew Ridge, Sundowner, Tres Jolie, Zandspruit, Harveston, Mogale City, Kim Bult,

The Entity will provide water tankers if any of the water supply is affected. Residents are also reminded that the City is still under level 1 water restrictions and we urge all to use water sparingly.

Johannesburg Water will keep customers informed on the process via our social media pages.

Ends

For media inquiries:
Isaac Dhludhlu
Manager: Communications and Marketing
Tel: 011 688 1577
Email: Isaac.dhludhlu@jwater.co.za

02 and 03 December 2020

Water Interruptions

 

 

Unplanned interruptions

Suburb(s) affected: Johannesburg North,  parts of  Maroeladal, Cedar Lakes, Cedar Creek,  Broadacres, Cedar Avenue West,  Needwood,  Chartwell,  Kya Sands, Northriding  and Farmall

Start Date:  01 December 22h00

End Date: 03 December 22h00

Impact: No water

Reason: Repair leak on the 600mm HDPE main at Talavera complex

Water tank(s):

  • Tanks will be filled at Cedar Lakes and the BP garage Broadacres Shopping centre
  • Tanks to be filled at Broadacres shopping centre
  • Cedar Creek estate
  • Terranova complex
  • Thorntree and Stonefields complex in Cedar Ave West
  • Runnymead and 3rd rd, Chartwell
  • Watercombe rd and Zandspruit , Chartwell
  • Fifth rd and Cladon Rd, Chartwell
  • Rietvalei rd and Zandspruit rd, Farmall
  • Royal Canin- refill tanks
  • Hyperion road (Hampstead complex)
  • Waterford view estate
  • Agulhas road, Bloubosrand
  • Drommedaris Road, Bloubosrand
  • Riverbend rd, Bloubosrand
  • Oosterland rd, Bloubosrand
  • Government Street, Jhb North
  • Selborne Street, Jhb North

 

planned interruptions

1. Suburb(s) affected: Bellairspark, Boskruin, Boundary Park, Bromhof, Bushill Estate, Cosmo City, Honey Park, Honeydew Manor, Hoogland, Huntershill, Kevin Ridge, Kya Sands, Laser Park, Noordhang, Northriding, Northgate, Northwold, Olivedale, Randparkrif , Sharonlea, Radiokop , Sonnedal, Honeydew Ridge, Sundowner, Tres Jolie, Zandspruit, Harveston, Mogale City, Kim Bult,
Start date: 01 December 2020 at 07h00
End date: 03 December 2020 at 19h00
Impact: During the cleaning exercise customers should not be affected.
Reason: Planned cleaning of Honeydew reservoir

2. Suburb(s) affected: Midrand
Street name: Between Dale Road and Douglas Road
Date: 02 December 2020
Time: 08h00-17h30
Impact: No water
Reason: Tie-in

3. Suburb(s) affected: Houghton, Forest Town, Killarney, Melrose, Melrose Estate, Riviera, Rosebank, Dunkeld, Saxonwold, Parktown North, Parkwood & Hydepark
Street name: All streets
Date: 03 December 2020
Time: 08h00-18h00
Impact: No water
Reason: Connection to new water network

4. Suburb(s) affected: Parkview
Street name: Tyron Avenue and Kerry Road
Date: 07 December 2020
Time: 09h00-20h00
Impact: No water
Reason: Tie in newly installed pipeline into existing mainline

5. Suburb(s) affected: Parkview
Street name: Tyron Avenue and Kinross Road
Date: 08 December 2020
Time: 09h00-20h00
Impact: No water
Reason: Tie in newly installed pipeline into existing mainline

6. Suburb(s) affected: Parkview
Street name: Tyron Avenue and Weasmeath Road
Date: 09 December 2020
Time: 09h00-20h00
Impact: No water
Reason: Tie in newly installed pipeline into existing mainline

07 – 09 December 2020 interruptions

Water Interruptions

 

 

Unplanned Interruptions

1. Linksfield
Please note that the reservoir has built capacity and has been opened. We are still flushing air out of the system. Residents should start receiving water. Should you still not have any water in a short while, kindly provide us with your suburb and street name on Twitter and Facebook.

2. Suburb(s) affected: Orange farm Drieziek 5
Date: 08 December 2020
Time: 09h00-16h00
Impact: No water
Reason: Connect new water pipes to existing network

3. Area(s)/Properties Affected: Mayibuye, Friendship Town and areas of Rabie Ridge K60
Date: 08 December 2020
Time: 05h00-22h00
Impact: No water
Reason: Repair to broken valve
Water tanks: Roaming 1 in Mayibuye and 1 in Friendship Town and Rabie Ridge K60

4. Suburb(s) Affected: Randpark Ridge and parts of Boskruin
Start date: 8th December 2020 05h00
End date: 9 December 2020 at 02h00
Impact: No water
Reasons: Repairs to 400 mm pipe line
Water Tanks:
• Randparkrif Dr. cnr Molope
• Randparkrif Dr. cnr Mimosa
• Seder str cnr Frangipani
• Seder str cnr Randpark Dr
• Haakdoring Rd cnr Suikerbos Ave
• Kelly Rd cnr Tin Rd

 

 

Planned Interruptions

 

1. Suburb(s) affected: Parkview
Street name: Tyron Avenue and Kerry Road
Date: 07 December 2020
Time: 09h00-20h00
Impact: No water
Reason: Tie in newly installed pipeline into existing mainline

2. Suburb(s) affected: Parkview
Street name: Tyron Avenue and Kinross Road
Date: 08 December 2020
Time: 09h00-20h00
Impact: No water
Reason: Tie in newly installed pipeline into existing mainline

3. Suburb(s) affected: Parkview
Street name: Tyron Avenue and Weasmeath Road
Date: 09 December 2020
Time: 09h00-20h00
Impact: No water
Reason: Tie in newly installed pipeline into existing mainline

We appeal to all to use water sparingly and to remind them that level one water restrictions are still in place. Watering of gardens is not allowed between 6 am and 6 pm in summer months (1 Sept to 31 March) and furthermore, it is not allowed to wash paved areas and driveway using hosepipes.

Residents are encouraged to subscribe on our website, to our SMS notification service for alerts on planned or unplanned service interruptions. More information can be obtained on twitter: @jhbwater; Facebook: Johannesburg Water and our website.

Customer service inquiries:
24 hour Hotline: 011 688 1699/ 086 056 2874
SMS line: 076 333 5052
Email: Customer@jwater.co.za
Website: /

POWER FAILURE AT TREATMENT PLANT IMPACTED SOME RESERVOIRS

POWER FAILURE AT TREATMENT PLANT IMPACTED SOME RESERVOIRS

Water Interruptions

 

 

Media Statement
25 November 2020
POWER FAILURE AT TREATMENT PLANT IMPACTED SOME RESERVOIRS

Rand Water’s Zuikerbosch Water Treatment Plant experienced a power supply failure, which affected water pumping into some Johannesburg Water reservoirs.

The incident occurred on Tuesday, 24 November 2020, as a result of an Eskom cable failure between Eskom’s Snowden Substation and Rand Water. Eskom was called in and worked on repairs which were completed at 12:30 today 25 November 2020.

This incident has resulted in the low capacity of some Johannesburg Water (Hurstshill and Roodepoort area) reservoirs levels which are quite low. Full pumping has now begun by Rand Water and we are monitoring the situation.

Johannesburg Water would like to encourage residents to use water sparingly until our capacity has improved. Updates will be provided on social media pages.

Ends

For media inquiries:
Isaac Dhludhlu
Manager: Communications and Marketing
Tel: 011 688 1577
Email: Isaac.dhludhlu@jwater.co.za

23 November 2020 – Johannesburg Water launches major sewer unblocking project in Greater Ivory Park 

23 November 2020 – Johannesburg Water launches major sewer unblocking project in Greater Ivory Park 

Media Statement 
23 November 2020 
Johannesburg Water launches major sewer unblocking project in Greater Ivory Park 

Johannesburg Water Midrand depot has been busy at work targeting twelve hot spot extensions In Greater Ivory Park from November till the end of December 2020, clearing 3055 sewer blockages in over 34 kilometres.

Sewer blockages are increasing in the area as a whole and are getting more difficult to resolve and the old methodology of a Sewer Team with rods is not giving the intended results in the area anymore, even though the blockage might be resolved it would normally block again within 24 hours.  This is largely due to the large amount of “debris” in the system which settles in the line thereby causing repeat blockages.

When clearing blockages, teams usually find material such as sand, rags, sanitary towels, clothing, rocks and at times foetuses of aborted babies and these foreign objects are not what a sewer line is intended to convey.

The illegal connections to the system, encroachment of uncontrolled buildings and shacks into the servitudes, large numbers of backyard dwellings, with many existing dwellings having more than ten backyard rooms. This leads to overuse of the system and insufficient capacity.

Part of the implementation plan of this project is to perform repairs on these identified Hotspots which will reduce recurring sewer blockages. They identified twelve hotspot extensions within greater Ivory Park include Kaalfontein Ext 1, 4, 5, 23 and Ivory Park ext 2, 5, 6, 8, 9, 12, 13 and Rabie Ridge ext 5.

Residents are urged to look after the infrastructure and report all service failures, more importantly, use the sewer lines for its intended purpose which is to transport waste.

Ends

For media inquiries:
Isaac Dhludhlu
Manager: Communications and Marketing
Tel: 011 688 1577
Email: Isaac.dhludhlu@jwater.co.za