by l3rato | Jul 25, 2022 | Interruptions 2022
Unplanned interruptions
1. Suburb(s) Affected: Sandringham & Glenhazel
Affected Street Names: George, Orange, Wales, Margaret Rose, Edward, Connaught, Victoria, Wellington, Henry and Anne Street
Date: 02 August 2022
Time: 08:00-18:00
Impact: No water
Reason: Tie in
2. Suburb(s) Affected: Johannesburg North, Maroeladal, Cedar Lakes, Cedar Creek, Broadacres, Cedar Avenue West, Needwood, Chartwell, Parts of Kya Sands, Northriding, Bloubosrand & Farmall.
Start date: 28/07/22 at 07h00 Postponed to 02 August 2022. Further details will be provided
End date: 30/07/22 at 20h00
Impact: No water
Reason: Tie-in
Water tank sites:
• Cedar Lakes
• BP garage Broadacres Shopping Centre
• Broadacres Shopping Centre
• Cedar Creek Estate
• Terranova Complex
• Thorntree & Stonefields complex
• Runnymead & 3rd Rd, Chartwell
• Watercombe Rd & Zandspruit, Chartwell
• 5th Rd & Cladon Rd
• Rietvalei Road & Zandspruit Rd, Farmall
• Royal Canin
• Hyperion Rd (Hampstead Complex)
• Waterford View Estate
Planned interruptions
1. Suburb(s) Affected: Kyalami AH, Kyalami AH x1, Kyalami Heights, Kyalami Park, Kyalami Ridge x3, Glenferness AH, Glenferness x1 & 2.
Street Name: Hawthorne, Begonia, Cedar, Main, Ash, Zinnia, Pine, Rena, Maple, Oak, Salvia, Mull, Duncan, Lachlan, Macgregor, Maccines, Macintyre, Macgillivary, Crocus, Cactus, Jacaranda, Dahlia, Rose and Galanthus, Kyalami Boulevard, Monza, Indianapolis, Monte Carlo, Silverstone, Spur, Percheron, Palamino, Papenfus, Pinto Place, Shetland, Arabier, Lipizzaner, Mustang, Lourens Road.
Date: 02 August 2022
Time: 09h00-16h00
Impact: No Water
Reason: Tie In of new infrastructure
2. Suburb(s) Affected: Orange Farm (Drieziek)
Street Names: All streets
Date: 02 August 2022
Time: 09:00-19:00
Impact: No water
Reason: Lowering of storm water pipes for water channels
Johannesburg Water thanks residents for patience and understanding and apologises for the inconvenience caused.
Residents are encouraged to subscribe on our website, to our SMS notification service for alerts on planned or unplanned service interruptions. More information can be obtained on twitter: @jhbwater; Facebook: Johannesburg Water and our website.
Customer service inquiries:
24 hour Hotline: 011 688 1699/ 086 056 2874
SMS line: 076 333 5052
Email: Customer@jwater.co.za
by l3rato | Jul 21, 2022 | Interruptions 2022
- Major burst: Cnr President Fouche and CR Swart Drive, Bromhof.
There is a major burst pipe on President Fouche & CR Swart in Bromhof. The depot is currently isolating water in order to attend to burst, and we currently do not have ETC. We will provide roaming tankers in the affected areas.
Areas affected: Boskruin, Bromhof & Parts of Olivedale
2. Northcliff Tower
The outlet valve at Northcliff Tower has ceased in a closed position, resulting in no water into the tower zone. Teams are onsite operating the pumps to supply customers through a bypass. The pumps will operate at intervals to avoid bursts on the network. The outlet valve will be replaced during the course of today. We estimate that the tower will be at normal capacity by early this evening. Further details on progress will be provided to customers.
Areas affected are Northcliff and Waterval Estate Ext5, Greymont
Johannesburg Water thanks residents for patience and understanding and apologises for the inconvenience caused.
Residents are encouraged to subscribe on our website, to our SMS notification service for alerts on planned or unplanned service interruptions. More information can be obtained on twitter: @jhbwater; Facebook: Johannesburg Water and our website.
Customer service inquiries:
24 hour Hotline: 011 688 1699/ 086 056 2874
SMS line: 076 333 5052
Email: Customer@jwater.co.za
by l3rato | Jul 20, 2022 | Interruptions 2022
Suburbs Affected: Breauanda Ext 2, Grobler Park Ext14, Helderkruin All Ext, Horizon View Ext 1 & 4, Princess A.H All Ext, Princess All Ext, Roodekrans Ext 1,2,4,18, Technikon, Westgate Ext 1,2,4, WilroPark, WilroPark All Ext and Witpoortjie.
Date: 21 July 2022
Time: 09h00-15h00
Impact: No Water
Reason: Repair burst on Helderkruin Tower inlet.
Johannesburg Water thanks residents for patience and understanding and apologises for the inconvenience caused.
Residents are encouraged to subscribe on our website, to our SMS notification service for alerts on planned or unplanned service interruptions. More information can be obtained on twitter: @jhbwater; Facebook: Johannesburg Water and our website.
Customer service inquiries:
24 hour Hotline: 011 688 1699/ 086 056 2874
SMS line: 076 333 5052
Email: Customer@jwater.co.za
by l3rato | Jul 20, 2022 | Interruptions 2022
1. Suburb(s) Affected: Northcliff
Street Name: Willow, Acacia, Weltevreden & Mimosa Roads
Date: 27 July 2022
Time: 08h00-17h00
Impact: No Water
Reason: Tie In of new 110mm Diameter Pipe into Existing of 110mm Diameter Pipe.
Johannesburg Water thanks residents for patience and understanding and apologises for the inconvenience caused.
Residents are encouraged to subscribe on our website, to our SMS notification service for alerts on planned or unplanned service interruptions. More information can be obtained on twitter: @jhbwater; Facebook: Johannesburg Water and our website.
Customer service inquiries:
24 hour Hotline: 011 688 1699/ 086 056 2874
SMS line: 076 333 5052
Email: Customer@jwater.co.za
by l3rato | Jul 12, 2022 | archive, Media Statement
MEDIA STATEMENT
FOR IMMEDIATE RELEASE
DATE: 13 JULY 2022
Planned Maintenance – Rand Water Palmiet System (18:00 – 15 July to 06:00 – 16 July)
Johannesburg Water wishes to inform residents of the Rand Water scheduled maintenance of a delivery valve on the Palmiet system on 15th July 2022. The scheduled maintenance will commence at 18h00 on 15th July 2022 and will be completed at 06h00 on the 16th July 2022.
The Palmiet system supplies water to Midrand region, Diepsloot, Linmeyer, Southills, and Klipfontein View through Ekurhuleni municipality. There will be a 30% reduction of normal water supply.
Johannesburg Water does not anticipate water supply disruption, as all Rand Water reservoirs, supplied from the Palmiet system, will be filled to capacity. Most of the work will be completed during the night when demand is at its lowest. The maintenance needs to be done during the low peak season (winter) and will prepare Rand Water for the high water demand season (summer).
Johannesburg Water will monitor affected water supply into affected infrastructure and provide updates to customers as the work progresses.
ENDS